1
/
of
1
Ultratech Weatherpro Top Shield Ezy Liquid Waterproof Chemical
Ultratech Weatherpro Top Shield Ezy Liquid Waterproof Chemical
Regular price
Rs. 341.00
Regular price
Sale price
Rs. 341.00
Taxes included.
Shipping calculated at checkout.
Product Overview
Packaging Size: 1 ,4, 10, 20 L
Form: Liquid
Usage/Application: Waterproofing
Tensile Strength: Minimum 2
Elongation at Break: Minimum 250
Crack Bridging: Up to 2 mm
Availability: In Stock
Areas of Application
- New or existing flat or sloped roof surfaces
- Conventional systems—Brick Bat Coba, IPS, screed, etc.
- Refurbished or repaired roofs
Features & Benefits
- Excellent flexibility with crack-bridging ability up to 2 mm
- Resists water pressure up to 5 bar @ 500 microns DFT
- Reduces roof surface temperature by up to 10°C**
- UV-resistant coating with long-term weather durability
- Water-based, eco-friendly, low VOC formulation
- Resistant to growth of algae and fungi
- Water-vapour permeable coating – prevents blistering
Surface Preparation
Proper surface preparation is essential for best waterproofing performance. Follow the steps below:
- Clean the entire surface using a high-speed water jet or wire brushing to remove dirt, dust, oil, laitance, and loose materials.
- Treat algae, mould, or fungus with suitable fungicidal wash or bio-wash.
- Remove any existing bitumen coating completely.
- Fresh cement sand screed or IPS surfaces must be cured for 4–6 weeks before coating.
- Ensure proper roof slope and level undulations to avoid water stagnation.
- Repair damaged areas using Polymer Modified Mortar (PMM) with Seal & Dry SBR or UltraTech ready-to-use repair mortar.
- Verify adequate drainage: minimum two outlets of 100 mm diameter for every 50 sq.m area.
- Seal gaps around pipe inserts using tapes or PMM with Seal & Dry SBR.
- Round off edges near parapet walls and other upstands with SBR mortar fillets.
- For old brickbat coba or cement screed roofs, check for hollowness and repair weak areas using PMM.
- Treat cracks with PMM. Expansion joints must be filled using suitable sealants.
- For shrinkage and non-moving cracks:
- Apply a primer coat of Top-Shield EZY.
- Apply a thick wet coat reinforced with mesh.
- Allow to dry, then apply a second wet coat and cure for 5–6 hours.
- Treatment should extend 75 mm on both sides of the crack.
- Apply similar treatment around joints, corners, drain outlets, and stress points.
Returns and Exchange policy
Returns and Exchange policy
Returns Accepted Within 24 Hours of Delivery under the following conditions:
- The product is damaged or defective.
- The wrong item was delivered or items are missing.
- Used products are not eligible for return.
Please refer to our for full details.
Share
