VCNITI

Current Location

Select your address
Help
Search "cement"
Ashirvad FlowGuard Plus SDR - 11 CPVC 5 m Water Pipe
Ashirvad

Ashirvad FlowGuard Plus SDR - 11 CPVC 5 m Water Pipe

336
Inclusive of all taxes
Fast Delivery4-hour Ultra-fast Delivery
Genuine ProductVerified Suppliers

Product Description

Ashirvad FlowGuard Plus SDR-11 CPVC 5 m Water Pipe

Ashirvad FlowGuard Plus CPVC Pipe SDR-11 is a premium hot and cold water distribution pipe manufactured using advanced FlowGuard Gold CPVC technology. Designed for high-pressure plumbing systems, it offers exceptional durability, corrosion resistance, and long-term performance in residential and commercial applications.

Technical Specifications

  • Pipe Type: CPVC Hot & Cold Water Distribution Pipe
  • Size: ¾ in. (20 mm)
  • Length: 5 meters (16.4 ft)
  • Pressure Class: SDR-11
  • Temperature Rating: Up to 93°C continuous, 100°C intermittent
  • Color: Cream / Beige
  • Certifications: ASTM D2846, NSF/ANSI 61 (Potable Water), ISI Marked

Key Features

  • Handles high pressure – ideal for multi-story and high-rise buildings.
  • Smooth inner surface prevents scale formation and bacterial growth.
  • Corrosion-resistant – no rust or pinhole leaks like metal pipes.
  • Low thermal conductivity reduces heat loss in hot water lines.
  • 5-meter length minimizes joints and reduces leak risks.
  • Long service life with minimal maintenance.

Recommended Applications

  • Hot water distribution – geysers, solar heaters, centralized systems.
  • Cold water plumbing – overhead tank and kitchen supply lines.
  • High-rise residential & commercial buildings.
  • New construction and renovation projects.
  • Hotels, hospitals, schools, and office complexes.

Installation Guidelines

  • Store horizontally on flat surface away from direct sunlight.
  • Cut squarely using pipe cutter; deburr and chamfer edges.
  • Use CPVC cleaner and primer before applying solvent cement.
  • Hold joint for 30 seconds after insertion for proper bonding.
  • Provide pipe supports at 1-meter intervals for horizontal runs.
  • Allow 24 hours curing before pressure testing.

Customer Reviews